You are here

High Capacity Boiler Panel 4 Pump

Stk#: 
BC G2-2
Short Description: 
HI CAP BOILR PANL 4 PUMP
Status: 
Active
Date Introduced: 
September 21, 2015

The BCG2 Boiler Panels are designed to work with the IBC SL20-115 G2 Boiler. The panel primary piping matches up to the boiler supply and return, and the pre-wired terminal strip makes for a straightforward electrical job.

Features:

  • Primary piping matches up to boiler.
  • Primary Pump, DHW Pump, and two Radiant Pumps.
  • Isolation valves at every connection.
  • Terminal Strip for wiring to boiler.

Benefits:

  • Pre-engineered panel design saves contractors time and labor.
  • All components are covered by a single warranty.
  • Boiler specific design allows for simplified wiring.
Thumbnail Stk# Title Publication Date Size Download
Look Whats New, Brochure
L5824 BCG2 Boiler Panels Cutsheet 2015-09-02 779.25 KB Download
Instructions
L6BCG2 BCG2 Boiler Panel Instructions 2016-04-15 5.73 MB Download
Submittal
SUBBCG2 BCG2 Boiler Panel Submittal 2015-07-23 894.71 KB Download

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer