You are here

6 Zone Pump Wiring Center

Stk#: 
41316
Short Description: 
6ZONE PUMP WIRING CENTER
Status: 
Active
Date Introduced: 
July 1, 2019

The Pump Wiring Centers allow wired thermostats to control pumps and boilers for hydronic systems while supporting the following functions and features:

  • Primary pump control.
  • Priority zone support (domestic hot water).
  • Purge – Priority pump continues to run for 2 minutes after end of priority call.
  • Exercise – pumps turn ON for 30 sec. after 72 hours of inactivity.
  • Thermostat grouping.
  • ZC/ZR boiler enable support.
  • XX and AUX normally open contacts support.
  • Master / Slave function for up to 5 units (1 master / 4 slaves).
  • LED indicators for zones and Priority status.
Other ID: 
AKL06P
Thumbnail Stk# Title Publication Date Size Download
Instructions
L641316 6 Zone Pump Wiring Center Instructions 2017-02-01 1.45 MB Download
Submittal
SUB41310 Pump Wiring Center Submittal 2019-07-25 311.55 KB Download

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer